Council approval
Redland City Council Approval for Carports & Patios
The Redlands, on Brisbane's bayside, including Capalaba, Cleveland, Victoria Point and the bay islands

QBCC Licence [00000]Licensed Queensland builder
[4.9] from [NN] reviewsGoogle Business Profile
2–6 weeks approvalWe lodge it and chase it
[6 & 15-year] warrantiesStructural and material
The Redlands sit on Brisbane’s bayside, east of Logan and south of the river mouth.
What decides it
- Mean height of the structure.
- How close it sits to your boundary. 500mm with your neighbour’s written agreement.
- Any overlay over your property.
On properties close to the water, coastal exposure affects the specification of the steel and fixings. We sort that out when we quote. The right specification is what stops a structure streaking with rust in five years.
How long it takes
2–6 weeks in the ordinary case, longer where a relaxation is needed.
What we do
We prepare the drawings, lodge the application with Redland City Council and deal with the council directly. A certifier signs off the structure at completion.
Send us your address
Overlays belong to the property, so we need your address to check. Send it through and we will.
We measure the setbacks
We draw and engineer it
We build to the approved plans
Send us your address
We will check what sits over your property and tell you where you stand with Redland City Council before you spend anything.
Prefer to talk? 07 3276 8899
- Licensed Queensland builder, QBCC Licence [00000]
- A fixed price before anything starts
- Council application prepared and lodged by us
- [6 & 15-year] structural and material warranties